West Hub Development

The West Hub Development Project includes the development of the Sangos, Cinguvu, Mpungi, Mpungi North, Ochigufu and Vandumbu fields, at water depths ranging from 1,000 to 1,500 metres. The wells are arranged in groups and connected to the N’Goma FPSO (Floating Production Storage and Offloading Unit), which has a processing capacity of 100,000 barrels of oil per day. In December 2014, production started at the West Hub Development project in Block 15/06 (Eni 35%, operator), the first project in production operated by Eni in Angola, with an initial level of 45,000 barrels of oil/day, achieved through the N’Goma FPSO. The development of the project took place in just 44 months from the declaration of a commercial discovery and is a top industry result for deepwater developments. For this reason the West Hub Development is one of seven record-breaking projects from Eni, all of which are remarkable for their rapid approval rates and times to start-up.

Source: eni.com

Project Key-Facts

  • Project name West Hub(Mpungi, Ochigufu, Vandumbu)
  • Country Angola
  • Operator Yes
  • Start-up Achieved/1H18/2H19
  • Equity peak in 4 YP (kboed) 25

Plants

  • N’Goma

    It is a floating production, storage and offloading (FPSO) vessel, which will operate offshore of Angola as part of the West Hub Development Project. used for the offshore oil production, with a capacity' of treating 100,000 barrels of oil per day.

In pursuit of excellence

East Hub and West Hub Projects in Angola, in Block 15/06.

Learn more

ENI's great transformation - Fit for complexity

Eni has changed a lot during the last three years in order to face the challenges of the market and to better address the three major shocks that have affected the energy sector: the collapse of gas consumption in Europe; the decline of oil demand in Europe and refining margins ...

eniday

From Enivideochannel

Visit the official channel YouTube

How we reach a record - #EniRecord | Eni Video Channel

Seven special projects with one thing in common: extremely rapid approval and production start-up times. Find out more on https://www.eni.com/en_IT/media/focus-on/eni-record-eng.page Subscribe on Eni Video Channel https://www.youtube.com/channel/UC4T5-TgmOJWXgeOLGwj-Ekw ----- Want more from Eni? Facebook: https://www.facebook.com/EniItalia/?fref=ts Twitter: https://twitter.com/eni https://twitter.com/Eniday Instagram: https://www.instagram.com/eni/ Flickr: https://www.flickr.com/photos/enidigital/albums Google+: https://plus.google.com/u/2/106162487688494239281/posts

Eni’s activities in the energy industry

Egypt. This takes the total of discovered resources in the last three years to 3.4 billion boe at a cost of $1/boe. With the application of our distinctive technologies we have achieved extraordinary success [...] Marine field), in Egypt (the Zohr and Nooros projects), in Ghana (OCTP) and in ...

6 April 2017 eni.com Section: operations

The assets and operations of development of Eni's oilfields

kbbl/d is expected by the end of 2017; start-up of M'Pungi and M'Pungi North within the West Hub Development project in the offshore Block 15/06 (Eni operator with a 36.84% interest) in Angola, with a production [...] up of the East Hub Development project in the ...

4 May 2017 eni.com Section: operations

A year of solid results for the Company

continuation of a series of exploration successes with the discovery of 1.1 billion boe, at a unit exploration cost of $0.6 per barrel. We sold 40% of the Zohr field in Egypt to BP and Rosneft, confirming the validity [...] commitment to the fight against climate change has been ...

1 January 2016 eni.com Section: company

Eni’s activities in Angola

operator with a 36.84% interest) at the end of 2014 with the West Hub Development Project that represents the first Eni-operated producing project in the Country. The development program plans to hook up the [...] Hub project, production derived from five fields. Management plans to put into production two additions ...

12 May 2016 eni.com Section: enipedia

Congo: in search of Nené Marine

permit. It is located in the Marine XII block, less than 20km from the coast, at a depth of 28m. The project was completed extremely quickly; it took only a year, even less than initially predicted. Here's [...] efficiency. Claudio Descalzi Africa takes centre stage again Following the launch of ...

22 May 2017 eni.com Section: operations

Eni’s sustainability projects in Angola

potential of these training courses carried out thanks to this social project. The second phase of the Health Capacity Building social project will take place during 2016 as a follow-up of the first phase, where [...] Kilamba Kiaxi project pdf 529 KB Eni Angola - Energy, Society, Sustainability (July 2016) pdf 1 ...

12 May 2016 eni.com Section: enipedia

Eni’s sustainability project in Congo

Eni's sustainability project in Congo Eni's sustainability project in Congo Overview In detail: the initiatives of the integrated Hinda project (PIH) Eni's support in the country for access to energy [...] The Salissa Mwana Project pdf 1 MB The Integrated Hinda Project pdf 1 MB Sustainable development projects ...

12 May 2016 eni.com Section: enipedia

Eni Partner of the Gemelli Insieme project

Eni Partner of the Gemelli Insieme project Eni Partner of the Gemelli Insieme project Rome,17 May 2013 - Eni is a partner in the Gemelli Insieme project, an initiative created by the Policlinico Universitario [...] prevention of disease. The initiative will last a year and will cover various areas around Rome ...

17 May 2013 eni.com Section: enipedia

Agreement on the Kashagan project development

Agreement on the Kashagan project development Agreement on the Kashagan project development Overview In detail: the date of the event and a list of speakers the presentation viewable on Slideshare [...] Audiocast speakers: Paolo Scaroni - CEO Stefano Cao - COO E&P Division Agreement on the Kashagan project development Overview

15 January 2008 eni.com Section: enipedia

Increase and improvement of resources, our strategy for 2019

Organically-developed conventional upstream projects, with a large resource base and a competitive cost structure Increasing and enhancing the use of discovered resources to improve cash generation Main [...] the carbon footprint and the gradual elimination of routine gas flaring. Large projects at low unit cost The upstream development model will continue ...

12 May 2016 eni.com Section: enipedia