#ThisisEni-Bucket

over half the total population. Eni is aiming to improve access to drinking water through the Water Wells Project in Palma. In 2015 a small distribution network was created, comprising two wells with submersible

30 November 2017 eni.com Section: Sustainability

Mozambique: promoting access to water in Palma Village

was conducted in the beginning of 2014, totally financed by EEA . The first results of the "Water wells project" were recorded in Palma in 2015. The project aimed to improve the living, health and safety

19 January 2017 eni.com Section: media

Exploration model

production chains. Our Upstream model Eni's exploration strategy is driven by time-to-market speed and cost-effectiveness while converting discoveries into production. How to reach first oil before other companies [...] few more details about dual exploration and the projects it was successfully applied to. Design to cost - the overlapping of ...

31 August 2017 eni.com Section: operations

Exploration in 2016

resources were discovered, at a unit cost of $0.6/boe. The exploration resources discovered over the last 3 years consequently amount to 3.4 billion boe at a unit cost of $1/boe. Exploration activities are [...] resources of 1.1 billion boe in 2016, at a unit cost of ...

10 August 2017 eni.com Section: enipedia

Increase and improvement of resources, our strategy for 2019

Organically-developed conventional upstream projects, with a large resource base and a competitive cost structure Increasing and enhancing the use of discovered resources to improve cash generation Main [...] the carbon footprint and the gradual elimination of routine gas flaring. Large projects at low unit cost The upstream development model will continue ...

12 May 2016 eni.com Section: enipedia

Eni's strategy aim to give more value and solidity

organic portfolio, thanks to the quality and standing of our conventional assets and the design-to-cost approach of our new operating model. Upstream Production: CAGR +3% per year Exploration: new discoveries [...] target high levels of income generation through sustainable growth in the upstream sector and improved cost efficiency; and by ...

1 January 2016 eni.com Section: investors

Exploration activities and successful discoveries

billion boe of additional resources at a cost of 0.6 $/boe. Additions to the Company's resources backlog were 3.4 billion boe in the last three years, at a cost of 1 $/boe. Promising new prospects to be [...] 1.1 billion boe of additional resources at a cost ...

4 May 2017 eni.com Section: operations

The history of Zohr

development. Zohr: stages of development and the design-to-cost model Development involves using hi-tech solutions to create infrastructure while meeting time, cost and quality objectives. Thanks to some highly advanced [...] improve project engineering and reduce the time required to arrive at the FID. This is the design-to-cost model; dividing ...

17 October 2017 eni.com Section: operations

Eni is a partner of the 2012 MIT Europe Energy Conference

nanotechnology and solar energy : an advanced approach to overcome the current limits of efficiency and cost of solar technologies, using very thin layers of innovative materials assembled devices built on a [...] The expectation is to be able to produce self-assembling materials using potentially simple and low cost processes. Artificial photosynthesis ...

28 March 2012 eni.com Section: enipedia

2016 results

billion boe of additional resources at a cost of 0.6 $/boe. Additions to the Company's resources backlog were 3.4 billion boe in the last three years, at a cost of 1 $/boe. Promising new prospects to be [...] lower non-recurring gains in G&P weighted for 0.6 ...

6 April 2017 eni.com Section: company