West Hub Development

The West Hub Development Project includes the development of the Sangos, Cinguvu, Mpungi, Mpungi North, Ochigufu and Vandumbu fields, at water depths ranging from 1,000 to 1,500 metres. The wells are arranged in groups and connected to the N’Goma FPSO (Floating Production Storage and Offloading Unit), which has a processing capacity of 100,000 barrels of oil per day. In December 2014, production started at the West Hub Development project in Block 15/06 (Eni 35%, operator), the first project in production operated by Eni in Angola, with an initial level of 45,000 barrels of oil/day, achieved through the N’Goma FPSO. The development of the project took place in just 44 months from the declaration of a commercial discovery and is a top industry result for deepwater developments. For this reason the West Hub Development is one of seven record-breaking projects from Eni, all of which are remarkable for their rapid approval rates and times to start-up.

Learn more Source: eni.com

Project Key-Facts

  • Project name West Hub (Ochigufu, Vandumbu)
  • Country Angola
  • Operator Yes
  • Start-up 1H18/2H19
  • Equity peak in 4 YP (kboed) <10/<10

Plants

  • N’Goma

    It is a floating production, storage and offloading (FPSO) vessel, which will operate offshore of Angola as part of the West Hub Development Project. used for the offshore oil production, with a capacity' of treating 100,000 barrels of oil per day.

ENI's great transformation - Fit for complexity

Eni has changed a lot during the last three years in order to face the challenges of the market and to better address the three major shocks that have affected the energy sector: the collapse of gas consumption in Europe; the decline of oil demand in Europe and refining margins ...

eniday

From Enivideochannel

Visit the official channel YouTube

How we reach a record - #EniRecord | Eni Video Channel

Seven special projects with one thing in common: extremely rapid approval and production start-up times. Find out more on https://www.eni.com/en_IT/media/focus-on/eni-record-eng.page Subscribe on Eni Video Channel https://www.youtube.com/channel/UC4T5-TgmOJWXgeOLGwj-Ekw ----- Want more from Eni? Facebook: https://www.facebook.com/EniItalia/?fref=ts Twitter: https://twitter.com/eni https://twitter.com/Eniday Instagram: https://www.instagram.com/eni/ Flickr: https://www.flickr.com/photos/enidigital/albums Google+: https://plus.google.com/u/2/106162487688494239281/posts

Eni’s operations: mission, challenges and exploratory successes

goal is to reach 0 accidents UPSTREAM FPSO N' Goma - West Hub Project Armada Olombendo - East Hub Development Project Load out - Jangkrik Complex Project Goliat, the Giant - IV The start of the production [...] Giorgio De Rita - Eni Basilicata Exploration successes Thanks to our innovative dual exploration model we have achieved ...

10 August 2017 eni.com Section: operations

In pursuit of excellence

East Hub and West Hub Projects in Angola, in Block 15/06. In pursuit of excellence East Hub and West Hub Projects in Angola, in Block 15/06. We are proud of what we have achieved in Block 15/06. Leveraging [...] offshore of Angola as part of the East Hub ...

13 September 2017 eni.com Section: operations

In pursuit of excellence

East Hub and West Hub Projects in Angola, in Block 15/06. In pursuit of excellence East Hub and West Hub Projects in Angola, in Block 15/06. We are proud of what we have achieved in Block 15/06. Leveraging [...] offshore of Angola as part of the East Hub ...

25 May 2017 eni.com Section: operations

2016 portfolio development

expected by the end of 2017 start-up of M'Pungi and M'Pungi North within the West Hub Development project in the offshore Block 15/06 (Eni operator with a 36.84% interest) in Angola, with a production ramp-up [...] projects, such as: the Goliat Norwegian fields (Eni operator with a ...

9 August 2017 eni.com Section: enipedia

The assets and operations of development of Eni's oilfields

expected by the end of 2017; start-up of M'Pungi and M'Pungi North within the West Hub Development project in the offshore Block 15/06 (Eni operator with a 36.84% interest) in Angola, with a production ramp-up [...] projects, such as: the Goliat Norwegian fields (Eni operator with a ...

4 May 2017 eni.com Section: operations

Eni’s activities in Angola

liquefaction plant Eni offices and contacts in the country Exploration & Production Eni started production in the Block 15/06 (Eni operator with a 36.84% interest) at the end of 2014 with the West Hub Development [...] Development Project that represents the first Eni-operated producing project in the Country. The ...

12 May 2016 eni.com Section: enipedia

Congo: in search of Nené Marine

Africa takes centre stage again Following the launch of the West Hub Project in Angola and the results of testing on the Minsala Marine I well, Eni once again struck gold in Africa. Over the past four years, [...] equivalent (boe) in the Marine XII block , 1.5bn of which is ...

13 September 2017 eni.com Section: operations

Congo: in search of Nené Marine

Africa takes centre stage again Following the launch of the West Hub Project in Angola and the results of testing on the Minsala Marine I well, Eni once again struck gold in Africa. Over the past four years, [...] equivalent (boe) in the Marine XII block , 1.5bn of which is ...

22 May 2017 eni.com Section: operations

Exploration model

after the FID, OCTP in Ghana - a project that integrates the two-stage development of oil and gas deposits - is ready to yield 500m boe and 41bn cubic metres. And at West Hub in Angola, where development (for [...] analyses for development are made during exploration. The information collected enables us to ...

31 August 2017 eni.com Section: operations

Eni’s sustainability projects in Angola

Kilamba Kiaxi project pdf 529 KB Eni Angola - Energy, Society, Sustainability (July 2016) pdf 1 MB Eni Angola - Energia, Sociedade, Sustentabilidade (Julho de 2016) pdf 1 MB The Kilamba Kiaxi project pdf 529 [...] and water In 2014, Eni Angola carried out a Feasibility Study on Access to Energy and Access ...

12 May 2016 eni.com Section: enipedia