Offshore Cape Three Points

OCTP is an integrated offshore deepwater development project located approximately 60 km off the coast of the western region of Ghana, which includes volumes of oil in place of about 500 million barrels of oil and non-associated gas, or around 41 billion cubic metres that will be used entirely by the domestic market for the production of electrical energy. The project has launched production in just two and a half years, and three months ahead of schedule, and thanks to 18 subsea wells connected to the FPSO "John Agyekum Kufuor" and a 63km pipeline, will provide domestic gas supply to Ghana’s thermal power plants for more than 15 years. It is one of seven record-breaking projects from Eni, all of which are remarkable for their rapid approval rates and times to start-up.

Learn more Source: eni.com

Project Key-Facts

  • Project name OCTP Oil/Gas
  • Country Ghana
  • Operator Yes
  • Start-up 1H17/1H18
  • Equity peak in 4 YP (kboed) 20/20
Source: 2017-2020 Strategy Presentation

Plants

  • John Agyekum Kufuor

    The FPSO “John Agyekum Kufuor”, named after Ghana’s Former President Kufuor, is a floating production, storage and offloading (FPSO) vessel, that shall operate in Sankofa-Gye Nyame field in the Tano Basin, in Ghana’s offshore, for the Offshore Cape Three Points (OCTP) project. After setting sail from Singapore on 28 February, after 40 days the vessel reached Ghana on 10 April. The FPSO has an oil treatment capacity of 58,000 barrels per day and a gas treatment capacity of up to 210 million standard cubic feet per day. Additional facilities include a water injection module of up to 55,000 barrels per day and gas injection facilities of up to 150 million standard cubic feet per day.

ENI's great transformation - Fit for complexity

Eni has changed a lot during the last three years in order to face the challenges of the market and to better address the three major shocks that have affected the energy sector: the collapse of gas consumption in Europe; the decline of oil demand in Europe and refining margins ...

eniday

Eni reaches all-time production record

1 million and 950 thousand barrels of oil equivalent per day.

Learn more

From Enipics

Visit the official channel Flickr
Offshore Cape Three Points (OCTP)

Offshore Cape Three Points (OCTP)

Dal battesimo all'avvio della produzione From the naming ceremony to the launch

From Enivideochannel

Visit the official channel YouTube

An integrated oil&gas development project - OCTP Project | Eni Video Channel

An overview on OCTP Project. Find out more: https://www.eni.com/en_IT/home.page Subscribe on Eni Video Channel https://www.youtube.com/channel/UC4T5-TgmOJWXgeOLGwj-Ekw ----- Want more from Eni? Facebook: https://www.facebook.com/EniItalia/?fref=ts Twitter: https://twitter.com/eni https://twitter.com/Eniday Instagram: https://www.instagram.com/eni/ Flickr: https://www.flickr.com/photos/enidigital/albums Google+: https://plus.google.com/u/2/106162487688494239281/posts

The OCTP project in Ghana

The OCTP project in Ghana Oil and gas, access to energy and economic development. The OCTP project in Ghana Oil and gas, access to energy and economic development. The integrated project bringing energy [...] energy to Ghana Offshore Cape Three Points ( OCTP ) is an integrated deepwater project in Ghana split into ...

15 March 2018 eni.com Section: operations

OCTP Project Benefits

Contacts OCTP Project Benefits Through reliable supply of power, the OCTP Project will contribute significantly to the economic growth of Ghana's in the short-to-medium term. Ghana domestic natural gas [...] addition, Healthcare Project to strengthen primary infant and maternal medical services in three of the coastal districts in the Western ...

12 May 2016 eni.com Section: media

Ghana: the OCTP project

Contacts Ghana: the OCTP project The Offshore Cape Three Points (OCTP) is an integrated oil and gas development project being a major contribution to access energy in Ghana. Caption Description OCTP will [...] requirements in urban and rural areas and where needed most. Eni Ghana Exploration and Production Ltd is the ...

12 May 2016 eni.com Section: media

Gas advocacy

Ghana The Offshore Cape Three Points (OCTP) project is making an important contribution to energy access in Ghana. In May 2017, we brought into production our Integrated Oil & Gas Development Project off the [...] signed an agreement with the Ghanaian authorities for the development of this integrated oil and gas project ...

26 April 2018 eni.com Section: operations

Eni’s activities in Ghana

conducted by Eni in Ghana since 1960 the main development activities for oil and gas reserves concentrated in the Offshore Cape Three Points (OCTP) area Eni offices and contacts in the country Upstream Eni is [...] upstream sector with the Integrated Oil & Gas Development Project, in the Offshore Cape Three Points ...

12 May 2016 eni.com Section: enipedia

Eni’s sustainability projects in Ghana

Interview with Giada Namer Project Manager Eni Foundation Ghana pdf 1 MB Interview with Elsie Quarshie - Asst. Project Manager/M&E officer pdf 669 KB Eni in Ghana pdf 4 MB Eni in Ghana, training projects [...] collection plant of the joint venture between Eni, Vitol and the Ghana National Petroleum ...

12 May 2016 eni.com Section: enipedia

The exploration model and projects

progress was made in the implementation phase of the onstream Nené Marine Phase 2A project in the Marine XII block (Eni operator, with a 65 per cent stake): (i) the installation and launch of a new production [...] the Marine XII block. In February 2017, production start-up was achieved at the ...

9 May 2018 eni.com Section: operations

Eni’s activities in the energy industry

see problems, we see opportunities Eni has Upstream operations (the exploration, development and extraction of oil and natural gas) in 46 different countries. In 2017, Eni confirmed its leading position for [...] field ), in Egypt (the Zohr and Nooros projects), in Ghana ( OCTP ) and in Indonesia (the Jangkrik project ) . The skills ...

6 April 2017 eni.com Section: operations

2017: annual and fourth quarter performances

fourth-quarter results for 2017 reveal growth at Eni, more than doubling the adjusted net profit and adjusted operating profit for the third quarter. In 2017 Eni saw an adjusted operating profit of 5.8 billion [...] and G&P segments. Documents Eni: full year 2017 and fourth quarter results pdf 409 ...

27 April 2018 eni.com Section: enipedia

Sustainability

committed to working responsibly to protect and sustain local communities and the environment, within Eni sustainability framework and in compliance with IFC Performance Standards on Environmental and Social [...] to sustain their livelihoods and ensure they benefit from the economic activity generated by OCTP Project, pursuing sustainable development. In this regard ...

12 May 2016 eni.com Section: media

Eni’s relations with local communities

and abroad, Eni establishes relationships based on fairness, transparency and dialogue with local stakeholders, aimed at promoting collaboration with the communities in all phases of the project . The objectives [...] Environmental and Social Sustainability" of the International Finance Corporation (IFC), Eni Ghana OCTP as operator of the project, put together a ...

12 May 2016 eni.com Section: Sustainability

First half 2017 Results

Cabaça South East field began after just three years - five months ahead of schedule. The second project involved both oil and gas development: production started after just over two years, giving local [...] tuning our development plan for the Mexican offshore area . This is a major new area of exploration for ...

2 August 2017 eni.com

First half 2017 Results

Cabaça South East field began after just three years - five months ahead of schedule. The second project involved both oil and gas development: production started after just over two years, giving local [...] tuning our development plan for the Mexican offshore area . This is a major new area of exploration for ...

2 August 2017 eni.com Section: operations

Activities of exploration and productions of Eni

and production activities worldwide Eni operates in 42 countries in the exploration, development and production of oil and natural gas. Exploration and Production Eni is active in the exploration, development [...] have been the: Goliat field in the Barents Sea in Norway Jangkrik project in Indonesia oil and gas development in ...

12 May 2016 eni.com Section: operations

Exploration in 2016

exploration wells (10.2 for Eni). The commercial success rate is at the top levels for the industry (50% for Eni). At the end of the year there were 79 wells in progress (40 for Eni). Exploration wells and [...] hydrocarbon reserves In 2011, 16 new exploration wells (10.2 for ...

10 August 2017 eni.com Section: enipedia

2016 portfolio development

projects, such as: the Goliat Norwegian fields (Eni operator with a 65% interest) in the Barents Sea, achieving a production plateau of 100 kboe/d (65 kboe/d net to Eni) production re-start of the Kashagan field [...] end of 2017 start-up of M'Pungi and M'Pungi North within the ...

9 August 2017 eni.com Section: enipedia

The six legged dog history

of all Eni becomes a public limited company and starts the privatisation process. 1992 Eni reaches it's first half century with big exploration successes and new discoveries. 2003 The Istituto Eni Donegani [...] culture. Times have changed, but our values have remained the same. Eni: yesterday, today and tomorrow New ...

12 May 2016 eni.com Section: company

The assets and operations of development of Eni's oilfields

projects, such as: the Goliat Norwegian fields (Eni operator with a 65% interest) in the Barents Sea, achieving a production plateau of 100 kboe/d (65 kboe/d net to Eni); production re-start of the Kashagan field [...] end of 2017; start-up of M'Pungi and M'Pungi North within the ...

4 May 2017 eni.com Section: operations

Our Africa

exploration prospect in offshore Congo. 2014 Eni discovers Zohr, a supergiant gas field in the Egyptian offshore, the largest ever found in the Mediterranean Sea. 2015 Eni announces the approval of the Plan of [...] discovery. 2016 A new record for ENI: in just two-and-a-half years, three months ahead of schedule ...

1 January 2016 eni.com Section: media

Upstream

Our strategy is based on the integration of exploration and development. Eni's exploration model The strengthening of our Upstream business is one of the key elements of the new strategy that drives

31 August 2017 eni.com Section: operations